Dauphin Island bay side & Aloe Bay

Dauphin Island Bulkhead Permits on the Bay Side and East End

A Dauphin Island bulkhead on the bay side is allowed, unlike a Gulf-front wall. The Town, ADEM and the Corps each review it, and the new wall resets your building line.

Describe your project on this page ↓
Dauphin Island bay side waterfront mapNorth is at the top. The highlighted marker shows the selected community. Select a community name on the map to open its local guide. Links to nearby guides are listed under the map as well.Aloe BayMobile BayDauphin Island bay sideDauphin Island west endDauphin Island bay side waterfront mapNorth is at the top. The highlighted marker shows the selected community. Select a community name on the map to open its local guide. Links to nearby guides are listed under the map as well.Aloe BayDauphin Island bay sideDauphin Island west end
Map data: U.S. Census Bureau (2026) and USGS place names. For orientation only, not a survey or flood map.

Dauphin Island bay side & Aloe Bay at a glance

Who permits it
Town of Dauphin Island, then ADEM and the Corps for water work
Call first
Town Hall, (251) 861-5525
The water
Zeta peaked at the island gauge 2.42 feet over mean higher high water
Local rule to know
The 25-foot waterside setback is measured from the bulkhead

Get to know your waterfront

On Dauphin Island's bay side, from Aloe Bay to the east end, a bulkhead is allowed. It needs a $100 Town Coastal Use Permit and then ADEM and Corps approval. The Gulf-side seawall ban does not reach this shore. Because the 25-foot waterside setback is measured from the bulkhead, a new wall moves the line where you can build.

Town of Dauphin Island Zoning Ordinance No. 105, section 7.9.1 (Required Permits) · Appendix B: Schedule of Fees (Planning Commission and permit fees) · Town of Dauphin Island Zoning Ordinance No. 105, sections 4.9.1 to 4.9.7 and 5.6 · Town of Dauphin Island Zoning Ordinance No. 105, section 7.14 (Seawall Requirements & Regulations)

Town permits, state review and the projects shaping the bay side

The gist: you start at Town Hall and finish with the state and the Corps. The Town's own public work shows which methods it trusts.

How do you get a Dauphin Island bulkhead permit?

The Town needs a Coastal Use Permit for any lot on a waterbody, in a FEMA floodplain, or with wetlands or dunes. The work must also meet town, state and federal rules. Zoning Ordinance 105, section 7.9.1

  1. Apply for the building permit through the Citizenserve portal or at Town Hall. A contract and a materials and labor cost list are required. Town permit page
  2. Pay the $100 Coastal Use Permit fee. A Land Disturbance Permit is $35. Town fee schedule, Appendix B
  3. Go before the Planning Commission if site plan review applies. It meets the second Tuesday of each month at 5:00 p.m. at 1011 Bienville Boulevard. Town meeting schedule
  4. For work below high tide, send the Corps request through its online portal. Copy ADEM and State Lands on the joint application. Corps Mobile District Shoreline plan, permit path

The Town also bills for any engineering or environmental review it needs. Town fee schedule, Appendix B

Call Town Hall at (251) 861-5525 and ask for the building inspector, extension 229. Town Building Department page

Why does a new bulkhead change your setback?

Because the Town measures from the wall. In R-1 and the other residential districts, the waterside yard is 25 feet from the bulkhead. Zoning Ordinance 105, setbacks

  • If your lot has no bulkhead, the Town draws a line between the bulkheads next door.
  • If neither neighbor has one, the 25 feet runs from the mean high tide line. Zoning Ordinance 105, setbacks

Piers, docks, boat houses and lifts are accessory uses allowed by right in R-1 and the Working Waterfront district. Zoning Ordinance 105, accessory structures

Near salt or brackish wetlands, leave an undisturbed 30-foot buffer. Dock access may cross it straight out to the water. Zoning Ordinance 105, wetland buffer

What do ADEM and the Corps require?

The Gulf-side ban does not apply here. Seawall Ordinance 106 covers only the Gulf-fronting side. Zoning Ordinance 105, section 7.14 The state still sets a high bar.

  • ADEM will not permit armor unless it stands at the high-tide mark or higher, inland of wetlands. There can be no fill in marsh or grass beds, and no workable non-structural option. ADEM bulkhead rule
  • State Lands lets a replacement wall sit at or up to 2 feet waterward of mean high tide. A brand-new wall must be at or landward of it. State Lands rule
  • The Corps' 2026 Alabama program reserves its old bank stabilization permit, ALGP-11. Bulkheads now go under Nationwide Permit 13, and living shorelines under Nationwide Permit 54. Corps general permit program
  • ADEM's fee schedule, adopted effective October 15, 2026, sets $1,000 for a wall up to 50 feet long and $1,665 beyond that. ADEM fee schedule
  • ADEM's water quality certification starts with a pre-filing request at least 30 days ahead and typically takes 3 to 6 months. Shoreline plan, permit path

Rebuilding after a storm may fall under Nationwide Permit 3, if the wall was authorized originally. Corps maintenance permit

What has the Town built at Aloe Bay and Graveline Bay?

Aloe Bay's living shorelines were finished in April 2025. They use segmented rock breakwaters with marsh and beach fill, and protect 2,000 feet along DeSoto Avenue and the end of El Dorado Street. Town project page

Each of the two sites had lost about 100 feet of shore in 30 years. The grants were $2,211,700 and $2,993,500. Town grant record

  • The Aloe Bay Overlay requires site plan review by the Planning Commission and Building Official. Aloe Bay Overlay
  • Graveline Bay got about 60 acres of marsh mounds, finished in April 2023, after an estimated 40 percent of its marsh was lost since the 1950s. Town marsh project page Town fact sheet

Are there real bulkhead jobs to compare?

Only one Town bulkhead bid turned up, and no price was published. The Town advertised about 700 linear feet of marine bulkhead plus an elevated boardwalk on DeSoto Avenue, with bids opened July 30, 2025. Town bid notice The Town's bid page on November 4, 2026 listed no bulkhead or pier bids. Town bid page

At the island's airport, the county bid a stone revetment to replace a concrete bulkhead. County bid notices Little Billy Goat Hole got a repaired riprap jetty, sheet pile and dock work in winter 2022. Town project page

How high does water rise on the bay side?

It depends on the storm. Zeta peaked at the Dauphin Island gauge 2.42 feet over mean higher high water, the lowest of the Alabama stations listed, against 6.89 at Bayou La Batre. NWS Zeta report Elena in 1985 put 3.5 feet on the bay side, against 8.4 on the Gulf side. NWS Elena

Sally in 2020 was different. The island gauge read 3.10 feet over mean higher high water, the highest station listed. A 3 to 4 foot surge on the north side badly damaged docks and piers, including the Dauphin Island Marina. NWS Sally

Takeaway: piers took the damage in Sally, so ask how a pier ties into the bulkhead cap.

What is happening on the east end and the Causeway?

The Town's 2024 East End restoration placed 1,120,000 cubic yards of sand and widened the beach about 400 feet. Town update, November 2024

  • The Audubon Bird Sanctuary covers 137 acres on the east end. Town sanctuary page ADEM names it an area of preservation where alterations may not be permissible. ADEM rule
  • In May 2025 ALDOT announced a $33.7 million rehabilitation of the 1982 bridge, estimated at 3 to 4 years with some single-lane periods. ALDOT announcement, May 2025
  • The Causeway is the island's only evacuation route. Town evacuation page The Town's page schedules phase 3 of the Causeway shoreline project, about 100 acres of tidal marsh, for fall 2026 to spring 2027. Town project page

What do flood rules mean for a bay-side lot?

FEMA maps put the island in zones AE, VE and X. The Town's flood ordinance applies extra standards in AE and VE. Zoning Ordinance 105, flood overlay It adds 2 feet of freeboard above base flood elevation. Zoning Ordinance 105, freeboard

Spending at least half a building's value on repairs or upgrades within five years is substantial damage. Town FAQ FEMA's Community Status Book, retrieved November 4, 2026, lists the Town as CRS Class 6, with a 20 percent flood premium discount effective October 1, 2026. FEMA Community Status Book

The Gulf-front rules are in the west end guide. Across the Sound lie Coden and Heron Bay and Bayou La Batre. For permit contacts, see the Mobile County permit guide. Wall choices are covered in the bulkhead materials guide, and dock work in docks and boat lifts.

What could the work cost?

No per-foot bulkhead price has been published for this island. The 700-foot DeSoto Avenue job had no posted result. In 2014, an Alabama owner guide priced vinyl near $125 to $200 per foot, with sheet pile far higher. Add the $100 Town permit and ADEM's $1,000 or $1,665.

Prices below are published figures, not a quote for your wall. Local figures come from Baldwin County bid tables and a 2014 Mobile Bay guide. National guides and contractor pages fill the gaps, and each row says which one it is.

Compare quotes and plan a budget →

Find the relevant permits and records

Dauphin Island bay side & Aloe Bay researched starting points
Starting pointWhat to resolvePrepare and look up
Town Building Department
Building permit via Citizenserve portal
Contract plus a materials and labor list. Main line (251) 861-5525.
Town Coastal Use Permit
Any lot on a waterbody, floodplain or wetland
Town Planning Commission
Site plan review, Aloe Bay Overlay lots
ADEM Coastal Program, Mobile
State coastal review of bulkheads and piers
Corps of Engineers, Mobile District
Federal approval of in-water wall work

Prepare the questions for the responsible office.

Before you apply on the bay side

These steps keep the Town, ADEM and the Corps working from one plan.

  1. Mark the line your wall will set

    Find your lot's current setback line and see how a new wall moves it. The Town measures from the bulkhead.

    Town of Dauphin Island Zoning Ordinance No. 105, sections 4.9.1 to 4.9.7 and 5.6

  2. Map wetlands and the 30-foot buffer

    Mark any salt or brackish wetland and plan dock access straight out to the water.

    Town of Dauphin Island Zoning Ordinance No. 105, sections 4.11.4, 5.6 and 7.5.5

  3. Submit to the Town, then the agencies

    File through the Citizenserve portal, then file with the Corps and copy ADEM and State Lands.

    Business Licenses & Permits | Town of Dauphin Island · Mobile County Shoreline Management Plan (December 2025), Section 9

  4. Check your flood zone and 2 feet of freeboard

    Zone AE or VE brings the flood ordinance. Plan for 2 feet above base flood elevation.

    Town of Dauphin Island Zoning Ordinance No. 105, section 4.11.5 (SFHOD) · Town of Dauphin Island Zoning Ordinance No. 105, Article 2 definitions (Flood Protection Elevation; Freeboard)

Start with what you know

Plan a bay-side bulkhead or dock

Tell us your street, the waterbody and what the wall or pier is doing now. A local marine contractor will get back to you.

Each page draws on Mobile Bay permit offices, local ordinances, public bids, tide gauges and storm reports.

Prefer to talk it through?(251) 850-5560

Getting your form ready…

Dauphin Island bay side & Aloe Bay project questions

Can I replace a bulkhead on the bay side of Dauphin Island?
How much is the Dauphin Island Coastal Use Permit?

The fee is $100. A Land Disturbance Permit is $35, and Planning Commission site plan review is $100. The Town may also charge for engineering review.

Appendix B: Schedule of Fees (Planning Commission and permit fees)

When does the Planning Commission meet?

On the second Tuesday of each month at 5:00 p.m. in the Town Council Chambers at 1011 Bienville Boulevard.

Boards & Commissions | Town of Dauphin Island

How far must a house sit from the water on Dauphin Island?

In the residential districts, the waterside yard is 25 feet from the bulkhead. Without a bulkhead, the Town uses the line between neighbors' bulkheads, or 25 feet from mean high tide.

Town of Dauphin Island Zoning Ordinance No. 105, sections 4.9.1 to 4.9.7 and 5.6

Keep planning

Nearby waterfront guides

Dauphin Island west end & Gulf front, Coden, Heron Bay & Cedar Point, Bayou La Batre & Portersville Bay

View the local guide directory.

Show sourcesHide sources
  1. Town of Dauphin Island Zoning Ordinance No. 105, section 7.9.1 (Required Permits)Source reviewed 2026-11-04
  2. Appendix B: Schedule of Fees (Planning Commission and permit fees)Source reviewed 2026-11-04
  3. Business Licenses & Permits | Town of Dauphin IslandSource reviewed 2026-11-04
  4. Boards & Commissions | Town of Dauphin IslandSource reviewed 2026-11-04
  5. South Atlantic Division > Missions > Regulatory > AlabamaSource reviewed 2026-10-31
  6. Mobile County Shoreline Management Plan (December 2025), Section 9Source reviewed 2026-11-04
  7. Building Department | Town of Dauphin IslandSource reviewed 2026-11-04
  8. ADEM Admin. Code r. 335-8-2-.06 Shoreline Stabilization and Erosion MitigationSource reviewed 2026-10-31
  9. ADCNR Admin. Code r. 220-4-.09 Placement and Configuration of Piers and Other Improvements on State Owned Submerged LandsSource reviewed 2026-10-31
  10. 2026 Alabama General Permit Program, summary table Note 1Source reviewed 2026-10-31
  11. ADEM Admin. Code Chapter 335-1-6 Application Fees, adopted rule effective October 15, 2026Source reviewed 2026-10-31
  12. 2026 Nationwide Permit 3, Maintenance, 91 FR 768Source reviewed 2026-10-31
  13. Aloe Bay Living Shoreline | Town of Dauphin IslandSource reviewed 2026-11-04
  14. Aloe Bay Living Shoreline Fact Sheet #1 (July 2022)Source reviewed 2026-11-04
  15. Graveline Bay Marsh Restoration Project | Town of Dauphin IslandSource reviewed 2026-11-04
  16. Graveline Bay Marsh Restoration Project Fact Sheet #2 (Spring 2021)Source reviewed 2026-11-04
  17. Advertisement for Bids: Aloe Bay Harbor Town Phase II - Package I DeSoto Avenue Boardwalk & BulkheadSource reviewed 2026-11-04
  18. Bid Notices | Town of Dauphin IslandSource reviewed 2026-11-04
  19. Advertisement for Bids, Replace Bulkhead at Jeremiah A. Denton Airport (2023) and Phase II notice (2025)Source reviewed 2026-11-04
  20. Little Billy Goat Hole and East End Improvements, Construction Fact Sheet #2 (Winter 2023)Source reviewed 2026-11-04
  21. Hurricane Zeta Event SummarySource reviewed 2026-11-04
  22. NWS Mobile: Hurricane Elena (September 1985)Source reviewed 2026-11-04
  23. NWS Mobile: Hurricane SallySource reviewed 2026-11-04
  24. DI East End Beach & Dune Restoration | Town of Dauphin IslandSource reviewed 2026-11-04
  25. Audubon Bird Sanctuary | Town of Dauphin IslandSource reviewed 2026-11-04
  26. Alabama Administrative Code 335-8-1-.04 (Special Management Areas)Source reviewed 2026-11-04
  27. ALDOT to begin Dauphin Island Bridge rehabilitation project in coming monthsSource reviewed 2026-11-04
  28. Evacuation Route | Town of Dauphin IslandSource reviewed 2026-11-04
  29. DI Causeway Shoreline | Town of Dauphin IslandSource reviewed 2026-11-04
  30. Substantial Damage (SD) & Repetitive Loss (RL) Frequently Asked Questions for Property OwnersSource reviewed 2026-11-04
  31. FEMA Community Status Book Report: AlabamaSource reviewed 2026-11-04
  32. Alabama Coastal Area Management Program (ADEM Coastal Program page)Source reviewed 2026-10-31
  33. Living Shorelines: A Guide for Alabama Property Owners (Cost Guide, section 4)Source reviewed 2026-11-04