Coden, Heron Bay & Cedar Point

Bulkhead Repair in Coden, Heron Bay and Cedar Point

Bulkhead repair in Coden starts with two plain facts. This is unincorporated Mobile County, and most of the shore around Heron Bay is marsh, not wall.

Describe your project on this page ↓
Coden waterfront mapNorth is at the top. The highlighted marker shows the selected community. Select a community name on the map to open its local guide. Links to nearby guides are listed under the map as well.CodenBayou La BatreFowl RiverPortersvilleBayMississippiSoundCoden waterfront mapNorth is at the top. The highlighted marker shows the selected community. Select a community name on the map to open its local guide. Links to nearby guides are listed under the map as well.CodenBayou La BatrePortersvilleBay
Map data: U.S. Census Bureau (2026) and USGS place names. For orientation only, not a survey or flood map.

Coden, Heron Bay & Cedar Point at a glance

Who permits it
Mobile County for structures; three agencies review work in the water
Call first
Mobile County Inspection Services, (251) 574-3507
The water
The shore from West Fowl River to Bayou La Batre lost about 9 feet a year, 2010 to 2021
Local rule to know
No county zoning, but flood-zone permits need an elevation certificate or waiver

Get to know your waterfront

Coden, Heron Bay and Cedar Point sit in unincorporated Mobile County, which has no zoning but does require permits. The Mississippi Sound shore here is losing 3.5 to 9 feet a year in the county's 2025 shoreline plan, the fastest losses in the county. Most of the frontage is soft marsh edge, so a wall is the exception. Work below the high-tide line also needs a Corps permit, with copies to ADEM and State Lands.

Development and Zoning · Mobile County Shoreline Management Plan (December 2025), Table 14 · Mobile County Shoreline Management Plan (December 2025), Tables 16-17 · Mobile County Shoreline Management Plan (December 2025), Section 9

What owners on Bayou Coden and Heron Bay should know first

The short answer: the county will not tell you where to put a wall, but it will want a permit and a flood paper. The state and the Corps decide anything below the high-tide line.

Who permits a Coden bulkhead or pier?

Mobile County Engineering says there is no zoning in the unincorporated areas. You can send a parcel or key number and ask for that in writing. County Engineering, zoning

The county still wants a permit for almost any residential work, and it checks flood rules. If your lot is in a flood zone, the permit request needs a current elevation certificate or a waiver from the county's floodplain administrator. County permits page County permit checklist

Below mean high tide, the average high-water mark, the bottom belongs to the state. A brand-new wall goes at or landward of it. State Lands rule Replacement rule

How fast is the Sound shore eroding near Coden?

Faster than anywhere else in the county. The 2025 Mobile County shoreline plan measured yearly shore loss from 2010 to 2021, and West Fowl River to Bayou La Batre was highest at 9 feet.

Shore lost per year, 2010 to 2021
ReachFeet lost per year
Cedar Point to Barron Point
3.5
Barron Point to West Fowl River
7.3
West Fowl River to Bayou La Batre
9.0
Bayou La Batre to Point aux Pins
5.7
Point aux Pins to Middle Bay
3.8

Sources: Mobile County Shoreline Management Plan, December 2025. Shoreline plan, retreat rates

Nearly all of this shore is marsh. In the West Fowl River basin, about 98 of 113 miles are marsh or swamp, with only 3.58 miles of bulkhead and 0.74 of riprap. Shoreline plan, West Fowl basin Coden Bayou mapped 46.7 percent hard in 2012 but also 23.6 percent living shoreline. Heron Bay was only 2.6 percent hard. Living shorelines manual, Table 3

The plan warns that the marsh south of West Fowl River has little room to move inland. Without new sediment, it will likely break into open water. The plan proposes to spread about 13 million cubic yards of dredged sediment over 5,377 acres, from Heron Bay west toward Bayou Coden. Shoreline plan, thin-layer placement

What flood zones apply on Shell Belt Road and Coden Belt Road?

Sampled points are mostly VE zones, the high-wave kind. The number is the base flood elevation, in feet. Federal flood maps give these readings at named sites:

  • Shell Belt Road and the Bayou La Batre launch at the bayou mouth: VE 19.
  • Coden Belt Road: VE 17.
  • Dauphin Island Parkway just north of Heron Bay: VE 15.
  • Delta Port Marina in Coden: AE 12. FEMA flood layer, sampled sites

Both roads sit very low. The shore there lost about 5.7 feet a year since 1850, but the plan says the county's rock revetment has stopped that loss. Shoreline plan, Coden and Shell Belt

The plan suggests fringing marsh and a low rock sill in front of it. That would cost about $1.9 million for 6,140 feet on Coden Belt Road. Shell Belt Road, at 7,620 feet, would cost about $3.2 million. Shoreline plan, Coden and Shell Belt

How high did storm water get in Coden?

In October 2020, the Weather Service found Zeta high-water marks 4 to 8 feet above ground in the Coden area, likely including waves. NHC Zeta report

Zeta lifted the West Fowl River Bridge gauge to 5.92 feet over mean higher high water. Nate in 2017 reached 5.57. NOAA top water levels, West Fowl

Why it matters: Zeta put the West Fowl River gauge nearly 6 feet over mean higher high water. Ask a marine contractor or engineer what height the new wall should have.

What public work is changing the Cedar Point shore?

Cedar Point Pier is a 24-hour county fishing pier with over 100,000 visits in 2024. In February 2025 the county awarded about $1 million for access, parking and shoreline upgrades. County pier record The bid plan replaces a derelict timber sea wall with a rock revetment. County bid notice

Across State Route 193, the county awarded a $6.5 million boat launch in May 2026. Work began June 29, 2026, and should take about a year. County launch award

  • The Dauphin Island Causeway shoreline project runs 3.5 miles from Bayfront Park to Cedar Point. It used more than 150,000 tons of rock, finished in 2024. Town project page
  • The county awarded a $26,685,698 breakwater and marsh contract on August 14, 2023. County award
  • Work near it may need a Corps Section 408 review, and public launches at Jemison's and Delta Port Marina sit nearby. Shoreline plan, permit path Outdoor Alabama launch list

Is a living shoreline a better fit than a wall in Coden?

It can be. The plan rates a typical yearly storm wave off this shore, 0.5 to 0.9 feet at 100 feet out, as moderate for a living shoreline. Shoreline plan, wave modeling

State rules lean the same way. State Lands prefers vegetation and riprap to vertical seawalls, and ADEM wants non-structural options ruled out first. State Lands rule ADEM rule

At the plan's Sound meeting, owners showed little interest in living shoreline, and many believed armor was the county commission's job. Shoreline plan, Sound meeting Flood insurance does not cover seawalls or docks. Flood policy exclusions

  • In 2015 the Deepwater Horizon Trustees estimated breakwater projects at $2,300,000 for Point aux Pins and $8,050,000 for Shell Belt and Coden Belt roads. Trustees fact sheet
  • Gulf sturgeon critical habitat on the Sound runs east to Point aux Pins. Ask the Corps whether species review applies. Critical habitat unit 8

For method and materials, see the living shorelines guide and the shoreline erosion guide. County permit steps are in the Mobile County permit guide. Next door, Bayou La Batre has its own city rules, and Fowl River shares the same watershed. For riprap work, read about riprap and shoreline stabilization.

What could the work cost?

Public price anchors here are large projects, not a single lot. The Cedar Point launch is $6.5 million. The Causeway breakwater contract was $26,685,698. For a home wall, the 2014 MBNEP guide listed installed vinyl at $125 to $200 per foot. Get written local bids.

Prices below are published figures, not a quote for your wall. Local figures come from Baldwin County bid tables and a 2014 Mobile Bay guide. National guides and contractor pages fill the gaps, and each row says which one it is.

Compare quotes and plan a budget →

Find the relevant permits and records

Coden, Heron Bay & Cedar Point researched starting points
Starting pointWhat to resolvePrepare and look up
Mobile County Engineering
Zoning confirmation, site plan and flood review
Send your parcel or key number for written confirmation of no zoning. Call (251) 574-8595.
Mobile County Inspection Services
Building permit, flood development rules
Elevation certificate or waiver, plus a contract or signed estimate. Call (251) 574-3507.
Corps Mobile District, Regulatory Division
Federal permit for fill below high tide
File online, with drawings that show the mean high tide line. Call (251) 690-2658.
ADEM, Coastal Program (Mobile office)
State coastal review and fee
Send a design plan and a copy of the Corps notice. The fee schedule lists $1,000 for 50 feet or less on non-Gulf-fronting land, so ask which applies. Call (251) 304-1176.
ADCNR State Lands, Coastal Section
Consent for use of state-owned bottom

Prepare the questions for the responsible office.

Four steps before you hire anyone on Bayou Coden

Do these in order. Each one costs little and saves a redesign.

  1. Ask the county about your parcel

    Call Engineering with your key number. Get written confirmation of no zoning, and ask whether a site plan is needed.

    Development and Zoning · Commercial Site Plan

  2. Find your flood zone and base elevation

    Many Coden sites fall in VE or AE zones. Order an elevation certificate before you design anything.

    FEMA National Flood Hazard Layer, Flood Hazard Zones (layer 28) point queries · Mobile County Building Inspections - Information required for obtaining a building permit (7-1-26)

  3. Walk the shore with a marine contractor

    Ask whether a marsh sill fits this shore before you price a vertical wall. Note any marsh edge in front of your lot.

    Mobile County Shoreline Management Plan (December 2025), Section 6.1 and Table 19 · ADEM Admin. Code r. 335-8-2-.06 Shoreline Stabilization and Erosion Mitigation

  4. Send the Corps request online, then copy two agencies

    Use the Corps' Regulatory Request System, then give ADEM and State Lands a copy. The ADEM review can take three to six months.

    Mobile County Shoreline Management Plan (December 2025), Section 9 · Contact Us (Alabama Department of Conservation and Natural Resources) · South Atlantic Division > Missions > Regulatory > Alabama

Start with what you know

Plan a Coden shoreline job

Tell us your street, the shore type and what changed after the last storm. Then call, or send a request and let a local marine contractor reach out.

Each page draws on Mobile Bay permit offices, local ordinances, public bids, tide gauges and storm reports.

Prefer to talk it through?(251) 850-5560

Getting your form ready…

Coden, Heron Bay & Cedar Point project questions

Does Mobile County require a permit for a Coden bulkhead?

Almost any residential work in unincorporated Mobile County needs a permit, and a flood-zone lot needs an elevation certificate or waiver with the request. The county has no zoning in unincorporated areas, so you can ask Engineering for that in writing. Work below high tide also needs federal and state approval.

Permits · Mobile County Building Inspections - Information required for obtaining a building permit (7-1-26) · Development and Zoning

Why is the shore near Heron Bay losing land so fast?

The 2025 county plan measured about 9 feet lost per year between West Fowl River and Bayou La Batre from 2010 to 2021. Much of the shore is marsh with little room to move inland and no nearby sediment supply.

Mobile County Shoreline Management Plan (December 2025), Table 14 · Mobile County Shoreline Management Plan (December 2025), West Fowl River Thin-Layer Placement project sheet

What flood zone is Shell Belt Road in?

Shell Belt Road reads VE 19 on federal flood maps, and Coden Belt Road reads VE 17. VE is the wave-impact zone, and the number is the base flood elevation in feet. Your own lot can differ, so check the panel for your address.

FEMA National Flood Hazard Layer, Flood Hazard Zones (layer 28) point queries

Will flood insurance cover my Coden bulkhead?

No. The federal flood policy leaves out seawalls, bulkheads, docks and piers. Plan to pay for the wall yourself.

44 CFR Part 61, Appendix A(1), Standard Flood Insurance Policy, Dwelling Form

Keep planning

Nearby waterfront guides

Bayou La Batre & Portersville Bay, Fowl River & Mon Louis Island, Dauphin Island west end & Gulf front

View the local guide directory.

Show sourcesHide sources
  1. Development and ZoningSource reviewed 2026-11-04
  2. Mobile County Shoreline Management Plan (December 2025), Table 14Source reviewed 2026-11-04
  3. PermitsSource reviewed 2026-11-04
  4. Mobile County Building Inspections - Information required for obtaining a building permit (7-1-26)Source reviewed 2026-11-04
  5. Mobile County Storm Water Management Program Plan (December 2017), Appendices D and ESource reviewed 2026-11-04
  6. South Atlantic Division > Missions > Regulatory > AlabamaSource reviewed 2026-10-31
  7. ADCNR Admin. Code Chapter 220-4 (State Lands Division), r. 220-4-.09 Placement and Configuration of Piers and Other Improvements on State Owned Submerged LandsSource reviewed 2026-10-31
  8. Coastal Alabama Living Shorelines Policies Manual (Table 3, shoreline armoring in Baldwin and Mobile counties)Source reviewed 2026-11-04
  9. FEMA National Flood Hazard Layer, Flood Hazard Zones (layer 28) point queriesSource reviewed 2026-11-04
  10. National Hurricane Center Tropical Cyclone Report: Hurricane Zeta (AL282020)Source reviewed 2026-11-04
  11. CO-OPS top ten water levels, West Fowl River Bridge 8738043 and East Fowl River Bridge 8735523Source reviewed 2026-11-04
  12. Cedar Point Pier Improvements Construction Contract AwardedSource reviewed 2026-11-04
  13. Advertisement for Bids, Cedar Point Fishing Pier ImprovementsSource reviewed 2026-11-04
  14. Cedar Point Launch (contract award) and Boat Launch Construction noticeSource reviewed 2026-11-04
  15. DI Causeway Shoreline | Town of Dauphin IslandSource reviewed 2026-11-04
  16. Dauphin Island Causeway (contract award)Source reviewed 2026-11-04
  17. Jemison's Bait & Tackle; Delta Port Marina (Saltwater Boating Access)Source reviewed 2026-11-04
  18. ADEM Admin. Code r. 335-8-2-.06 Shoreline Stabilization and Erosion MitigationSource reviewed 2026-10-31
  19. 44 CFR Part 61, Appendix A(1), Standard Flood Insurance Policy, Dwelling FormSource reviewed 2026-10-31
  20. Alabama Living Shorelines Projects: Shell Belt and Coden Belt Roads; Point aux Pins (Phase IV Early Restoration fact sheet, 2015)Source reviewed 2026-10-31
  21. 50 CFR 226.214, Critical habitat for Gulf sturgeonSource reviewed 2026-10-31
  22. Commercial Site PlanSource reviewed 2026-11-04
  23. Inspection ServicesSource reviewed 2026-11-04
  24. 2026 Nationwide Permit 13, Bank Stabilization, 91 FR 768Source reviewed 2026-10-31
  25. Alabama Coastal Area Management Program (ADEM Coastal Program page)Source reviewed 2026-10-31
  26. ADEM Admin. Code Chapter 335-1-6 Application Fees, adopted rule effective October 15, 2026Source reviewed 2026-10-31
  27. Contact Us (Alabama Department of Conservation and Natural Resources)Source reviewed 2026-10-31
  28. Living Shorelines: A Guide for Alabama Property Owners (Cost Guide, section 4)Source reviewed 2026-11-04